
Dec 03, 2025
1
With the continuous development of science and technology, PCB board industry is also moving forward, technology upgrading has become a key element of the development of the industry...

AI server PCBs are high-end products governed by IPC‑6012 Class 3. Their fabrication process is complex, involving special processes such as high-layer-count lamination, back drilling, HDI, low-loss material machining, VLP copper foil, and resin-filled vias. In many projects, simulation, schematics,
Aug 14, 2026
190

In AI server 24–36 layer high-multilayer PCBs, stack-up planning is no longer merely about allocating signal and power layers; it is a comprehensive design endeavor involving signal integrity (SI), power integrity (PI), lamination processes, board thickness aspect ratios, and back-drilling technique
Aug 13, 2026
145

The enclosures of 800G optical modules are compact and sealed, featuring high thermal density in DSPs and laser driver chips, coupled with strong electromagnetic radiation from high-frequency channels. Optimizing trace routing alone is insufficient to address issues such as thermal throttling and EM
Aug 12, 2026
394

The root cause of most post-design PCB rework lies in oversights during the pre-design data preparation phase. This initial front-end review acts as a safeguard, intercepting potential risks before layout and routing begin. Many engineers import the netlist and jump straight into routing, neglecting
Aug 11, 2026
170

"I calculated the trace width for exactly 50Ω, but the fabricated board measures 46Ω." Many engineers blame "poor manufacturing quality" for this discrepancy. However, the real culprit is often overlooking the "hidden variables" in materials and fabrication processes.Why Is Impedance Control So Diff
Aug 10, 2026
554

Most late-stage PCB rework issues stem from oversights in pre-design documentation. The primary goal of this upfront review is to intercept potential risks before layout and routing begin. Many engineers import the netlist directly into the PCB environment and start routing immediately, skipping the
Aug 08, 2026
192
